D. Canca, A. De Los Santos Pineda, G. Laporte, J. A. Mesa López-Colmenar

We consider the problem of scheduling the construction of a railway rapid transit transportation network. We assume that the network topology is already known. The problem consists of sequencing the construction tasks in order to maximize the long term profit of the project. The problem can be viewed as a resource-constrained project scheduling problem, where both the budget and available construction equipment act as resources influencing the schedule. Since lines segments can be put into operation as soon as they are finished, both the costs and the revenues are dependent on the schedule. We propose a quadratic integer programming model which is solved to optimality by branchand-cut. To illustrate the methodology we apply the model to the construction of the Metro network of the city of Seville, and we perform sensitivity analyses on several model parameters.

Keywords: Railway rapid transit, network design, resource-constrained scheduling

Scheduled

GT10-3 Transport
September 5, 2019  2:45 PM
I3L10. Georgina Blanes building


Other papers in the same session

Diseño de redes de transporte urbano

A. De Los Santos Pineda, D. Canca, E. Barrena, A. García Hernández- Díaz

Problema del viajante con beneficio dependiente del tiempo.

E. Barrena, D. Canca, G. Laporte, L. Coelho


Cookie policy

We use cookies in order to be able to identify and authenticate you on the website. They are necessary for the correct functioning of it, and therefore they can not be disabled. If you continue browsing the website, you are agreeing with their acceptance, as well as our Privacy Policy.

Additionally, we use Google Analytics in order to analyze the website traffic. They also use cookies and you can accept or refuse them with the buttons below.

You can read more details about our Cookie Policy and our Privacy Policy.